Fit a flood series to a frequency curve and read off design peak flow and volume for return periods such as 20, 50 and 100 years, for flood-control planning and spillway design.
| Item | Formula / Note | Source / Standard |
|---|---|---|
| Return period and frequency | Return period T = 1 / P, where P is the annual exceedance probability | GB 50201-2014, Standard for flood control |
| Plotting position | For the m-th largest of n values, the plotting position is P = m / ( n + 1 ) | SL 44-2006, Design flood calculation code for water resources projects |
| Distribution type | The Pearson type III distribution is commonly used for design flood in China | SL 44-2006, Design flood calculation code for water resources projects |
| Design standard | The design flood standard is set by project grade and importance of the protected object | GB 50201-2014, Standard for flood control |
防洪(设计洪水)频率分析。免费在线工具,纯前端处理,数据不上传,保护隐私安全。