投资回收期

Energy Investment Payback Calculator

Compute the payback period of an energy-saving investment from its initial cost and annual savings, plus the simple return rate.

📐 计算公式
节能投资回收期(本页代码口径):回收期=初投资÷年节约额(年);联动量:年回报率=年节约额÷初投资×100(%)、10 年净收益=年节约额×10−初投资、10 年累计节省=年节约额×10(元)。校验:两项空值即提示并中止;两项均不得为负;年节约额为 0 时单独输出「∞(无法回收)」并保留其余三项。判据:无固定分级,回收期越短项目越优,通常明显短于设备寿命才具吸引力。

回收期 = 初投资 / 年节约。

Formula & Standard References

Item Formula / Rule Source / Standard
Simple payback period The simple payback period equals the total investment divided by the annual monetary saving. ISO 15686-5:2017, life cycle costing
Discounted payback period When the time value of money is considered, each year's saving must be discounted before accumulation. ISO 15686-5:2017, life cycle costing
NPV and IRR A project is viable when net present value is positive and the internal rate of return exceeds the discount rate. ISO 15686-5:2017 & ASHRAE Handbook - Fundamentals
📌 计算说明
  • 静态回收忽略折现。
  • 含折现需用动态回收期。

📚 深度解析:投资 / 年节约

💡 常见使用场景

光伏系统能源回收期
组件制造能耗约 400 kWh/kWp、系统年发电 1300 kWh/kWp:EPT≈400/1300≈0.31 年(约 4 个月),远短于 25 年寿命,净能源收益高。提示:含支架/逆变器制造能耗后 EPT 仍通常<2 年。

❓ 常见问题(FAQ)

EPT 和财务回收期哪个长?
通常财务回收期更长(受电价与初投影响),EPT 仅看能量,是环境可持续性的指标。
EPT 受什么影响?
制造工艺能耗、系统寿命、当地辐照/风资源;高资源区 EPT 更短。